• Uncertainty
The pilot scale is generally a production activity where the process exceeds the kilogram level for the first time, and there are various uncertain factors
Security risks are also uncertain
• Risk of Failure to Control
Adequacy of process safety studies and assessments
Whether process safety measures are in place
Whether the mass and heat transfer measures meet the technological requirements
• Operational risks
Whether the pilot equipment meets the requirements
Whether the quality of operators meets the requirements of special operations
Whether staff training is adequate and whether improper operation can be avoided